Showing laying of advance shore pipe. A new line is layed every 750 ft. of dredge advance. Shown also is section of almost completed levee. This levee is the reason that the discharge line has to be so long. River channel made by flood can be seen in extreme background. Station 1,800 feet. Kansas City District, channel diversion.