Construction of the Cape Girardeau Bridge. 1927. Pouring concrete for seal of caisson Pier No. 2. Derrick boat handling door on material lock; compressor barge maintaining air pressure in caisson.
Cape Girardeau Bridge Construction
Hartford, JohnBergmann, John A.
1927-12-04
picture
BridgesBargesDesign and constructionCranes, derricks, etc.Hydraulic engineeringRiver engineering
Cape Girardeau (Mo.)Mississippi River
1920-1929
Cape Girardeau 12-4-'27 Pouring Seal in #2 Cais.
Items in the UMSL Digital Library are protected by copyright, with all rights reserved, unless otherwise indicated. The contents of the UMSL Digital Library are made publicly available for use in research, teaching, and private study. Although the nature of archival and manuscript materials sometimes makes it difficult to determine the copyright status of an item, it is the user's responsibility to use them according to all applicable terms. Please contact the contributing partner for additional information regarding copyright status of a particular digital image, text, data set, or sound or video recording.
p-29-ovr-2-4
Herman T. Pott National Inland Waterways Library