Location of dredge in Pilot Canal on completion of dredging operations for cut No. 2. Just following departure, the second cut was made on left bank a distance of 1,800 ft. from upper end, which the view is towards.
Upper End of Pilot Canal
Covington, Ray
1952-10-19
picture
Pilot Canal ProjectDredges
Saint Joseph (Mo.)Pilot Canal
1950-1959
Items in the UMSL Digital Library are protected by copyright, with all rights reserved, unless otherwise indicated. The contents of the UMSL Digital Library are made publicly available for use in research, teaching, and private study. Although the nature of archival and manuscript materials sometimes makes it difficult to determine the copyright status of an item, it is the user's responsibility to use them according to all applicable terms. Please contact the contributing partner for additional information regarding copyright status of a particular digital image, text, data set, or sound or video recording.
RC Boats 260
Herman T. Pott National Inland Waterways Library