Letter from Enos B. Moore to his brother on the building of a new boat. He lamented that William's business had been dull. Moore described the progress of building a new boat, and that the rain and wind had been interfering. Despite that, the engines had been built and they hoped to put up the chimneys soon. He concluded that it may take about 3 weeks. He noted that he should be able to get a crew cheaply as crews are nearly starving.
Dakota on June 16, 1918 and arrived in St. Louis on July 2. The album contains 100 silver gelatin photographs that capture largely undocumented aspects of life along one of America's great western rivers. Each image provides viewers the intimate feeling of standing on the deck of the Scarab, alongside Fiske, as he makes his journey. The album includes views of the Scarab and the passing boats, Missouri
Receipt of Shipping for Mr. A. Langenberg, for delivery of good aboard the Str. BUCK ELK, signed by John Heckmann, clerk. Goods shipped include 5000 bricks, rope, and a skiff.
Complied from survey of Upper Mississippi River from St. Paul to Grafton - made in 1878 and 1879 under direction of Bvt. Lt. Col. F. U. Farquhar, U.S.A. Major, Corps of Engr's; with additions from notes and surveys done under the direction of Bvt. Maj. Gen'l G. K. Warren, U.S.A. Major, Corps of Engr's, Col. J. N. Macomb, Corps of Engr's and Major A. MacKenzie, Corps of Engr's. Drawn under the
Bill of Lading from the Evansville, Paducah & Tennessee River Packet Company for transport of 65 tons of #4 pig iron at $1.25/ton, for the Lagrange Iron Company from La Grange, Tennessee to St. Louis, Missouri. April 18, 1887.
Bill of Lading from the Evansville, Paducah & Tennessee River Packet Company for transport of 30 tons of #2 pig iron at $2.00/ton, for the Lagrange Iron Company from La Grange to Cincinnati Wharf River and Railroad Transfer Co. March 24, 1887.
Receipt for shipment on the steamboat Dacotah, for delivery of 25 barrels of M. T. oil, November 26, 1886. Shipment originated at La Grange and was bound for St. Louis.
Bill of lading for the Steamer CLYDE for shipment of 24 tons #1 pig iron, September 19, 1886 to Evansville, Indiana, for the La Grange Iron Co. at $1.50 per ton.
Bill of Lading for the steamer W. F. NISBET of the St. Louis and Tennessee River Electric Light Packet, for delivery goods to St. Louis, Missouri, for the La Grange Iron Company, August 31st, 1886.
Bill of lading for the Steamer CLYDE for shipment of 27 tons #1 pig iron and 15 tons #2 pig iron, May 14, 1886 to St. Louis, Missouri, for the La Grange Iron Co. at $2.00 per ton.