Material removed from Pilot Canal being discharged into Rover channel that is going to be diverted. Dredging for canal will be completed tonight. Dredge is at station 7+00'. The earth plug to be blasted is at station 6+50'. Kansas City District, channel diversion.
Accompanying report to the transportation survey commission of St. Louis., From: Report of the Transportation Survey Commission of the City of St. Louis / submitted to the Board of Aldermen.
A crane begins dismantling the right-field scoreboard at Busch Memorial Stadium Tuesday, making room for a new "state-of-the-art" scoreboard, where color instant replays will be shown on a 22-by-30-foot screen. A 22-by-44-foot screen will go up in left field to display black-and-white animation. Both will be ready for the opening baseball game April 5.
The dredges (Ste. Gen.) and (William Black) as the dredge opposite each other with 100 feet between them remaining, which will complete the diversion channel project. 50 ft. of the earth will not be dredged, it will be blasted. This is at station 7+00.
Lemay Pollution Case - This was the scene at the NL Industries DeLore plant at 4:30 p.m. Monday, 3.5 hours after the first air pollution red alert ever called in St. Louis County went into effect. The DeLore plant was one of the plants ordered to curb emissions.