More than $118 million in new construction shown here is nearing completion in downtown St. Louis. At left, the 20-story. $35 million 1010 Building is 8 percent occupied by May. In the center, the 30-story, $54 million Centerre Bank Building is the new home of some departments of the bank while interior construction is proceeding. At right, the 22-story, 330-room, $39 million addition to
Donald A. Pecsok, left, director of the St. Louis County air pollution control division, gives “OK” Tuesday to National Lead Company’s new manufacturing process. With him are Harry A. Moon, center, plant manager, and Edward A. Rudulph, chief engineer of the air pollution control division.
Bank of Belleville employees will don Pilgrim costumes Wednesday to help with Old Newsboys Day by selling the Globe-Democrat special edition at 47th and West Main from 7 to 9 a.m. and North Belt West and Illinois 161 from 8:30 to 9:30 a.m. Old Newsboys Day begin in 1957 and has collected and turned over more than $1.8 million to area children’s agencies/ The Globe-Democrat pays the entire cost of