The Betsy Ann was built in 1899 at Dubuque, Iowa. The dimensions of her steel hull were:- 165 x 39 x 5.5 feet. Tonnage, gross and net, 295 tons. She was originally built for and ran in Natchez-Bayou Sara trade on the lower Mississippi River. About 8:30 A.M. on April 5, 1907, while enroute from Bayou Sara to Natchez, she was struck by a heavy wind near Fordoche Landing, which carried away her
View of progress made to date. Total advance since start of dredging: 3,000 ft. Total time: 3 weeks this date. Average 1,000' per week. Total production to date for job: 658,489 cu. yds. Total dredged length of canal by both dredges: approx. 6,000'. Overall length of canal project: 9,000'. Dredge now at station 27/100. Started at station 57/100. Kansas City District, Channel Diversion Project.
Approaching lift bridge at Kansas City when enroute from St. Joseph, Mo. To St. Louis. Dredge (William H. Black) is passing through bridge. Kansas City District.
A fractured wrist bone will necessitate the Hawks' Bob Pettit wearing a cast on his left arm for the rest of the season. Pettit suffered the injury during the game with Boston Friday night and will try playing with the handicap for the first time today at Minneapolis.
October 29, 1937. - Looking upstream from pilot house of Grafton. Graded bank and mattress weaving about station 219-00. Note curve on which Grafton entered below dike No.79.2L.