Material removed from Pilot Canal being discharged into Rover channel that is going to be diverted. Dredging for canal will be completed tonight. Dredge is at station 7+00'. The earth plug to be blasted is at station 6+50'. Kansas City District, channel diversion.
The dredges (Ste. Gen.) and (William Black) as the dredge opposite each other with 100 feet between them remaining, which will complete the diversion channel project. 50 ft. of the earth will not be dredged, it will be blasted. This is at station 7+00.
Dredge (William H. Black) as it prepares opening in bank to start dredging at upper end of Pilot Canal. The (Ste. Gen.) is at station 11+40, Kansas City District, channel diversion.