Showing dredge (William H. Black) on upper side of Pilot Canal at station 6 + 00 dredging towards the 50' wide plug that will be blasted out. The (Black) dredged out the channel entrance for upper end. Dredging operations will be completed tonight.
October 29, 1937. - Lower end of cut where Ste. Genevieve began dredging. About station 295-00. Grand Tower Pile Dike and Revetment Contract, 1937-38: Woods Brothers Construction Company. Note: Photographs could not be taken at regular intervals because of adverse weather conditions.
The dredges (Ste. Genevieve) and (William H. Black) as they dredge opposite each other with 100' separating dredges to mark completion of the Diversion Channel Project. An Earth wall 50' thick will not be dredged. It will be blasted out. Dredges at station 6+00' and 7+00'. Kansas City District, channel diversion.
Showing laying of advance shore pipe. A new line is layed every 750 ft. of dredge advance. Shown also is section of almost completed levee. This levee is the reason that the discharge line has to be so long. River channel made by flood can be seen in extreme background. Station 1,800 feet. Kansas City District, channel diversion.
View of progress made to date. Total advance since start of dredging: 3,000 ft. Total time: 3 weeks this date. Average 1,000' per week. Total production to date for job: 658.489 yds. Total dredge length of canal by both dredges: approx. 6,000'. Overall length of canal: 9,000'. Started station 57/100. Kansas City District, Channel Diversion Project.
Showing the dredge (William H. Black) which is placed at upper end of Pilot Canal and is dredging towards us. 1,350 feet separates the two dredges. (Black) started dredging operations at 12:30 P.M. This dredge is now cutting through the upper access road at station 13+50'. Kansas City District, channel diversion.
Dredge (William H. Black) as it dredges at upper end of canal. Making very slow progress in the gumbo. It is approx. station 600'. This dredge is at station 9+70'. The cut is now widened to 230' width. Has been 200'. Kansas City District, channel diversion.
Showing the Earth dike that now separates the present river channel and the channel that it is to be diverted into (lowerside). On upper side of dike is dredge (William H. Black). The dike will be dredged to 50' width, which will be blasted out. Dike is between stations 6+00' and 7+00'. Dredging completed tonight. In center, the blasting holes area being bored. Kansas City District, channel