million contract to produce 4,500,000 rounds of the 105-millimeter shells. Target date for production was Jan. 1, 1967, but Chevrolet is already operating the plant at about 18 percent capacity. Still red hot, the steel is checked for length and depth of cavity. it is then cooled, again measured and sent to machinery building."