View of progress made to date. Total advance since start of dredging: 3,000 ft. Total time: 3 weeks this date. Average 1,000' per week. Total production to date for job: 658,489 cu. yds. Total dredged length of canal by both dredges: approx. 6,000'. Overall length of canal project: 9,000'. Dredge now at station 27/100. Started at station 57/100. Kansas City District, Channel Diversion Project.
1. Entrance to Atchafalaya River. 2. A "Swamper's" house on the Atchafalaya. 3. A Swamper. 4. Steamer running the rapids of the Atchafalaya. 5. Red River Landing. 6. Castle on the Atchafalaya. 7. Little Whiskey Bayou. 8. A Swamper's garden (in a Canoe). 9. The ash cabin, Atchafalaya. 10. Map showing changes in the Mississippi's current.
Front Page of Frank Leslie's Illustrirte Zeitung from the 13th of July, 1872, depicting a concert hall and its auditorium where a singing festival was held. The caption below the auditorium specifically mentions the reception concert. The illustrations were done by Joseph Ferdinand Keppler. The text is from "Herrn Mahlhuber's Reiseabenteuer" by Friedrich Gestäcker (Gestaecker).
A near riot resulted yesterday when teenagers flocked to see Frankie Laine, Cab Calloway, Dinah Washington and Cootie Williams at a free show given at Club Riviera, 4460 Delmar bl. The club was damaged in the rush, although there was no vandalism.