View of progress made to date. Total advance since start of dredging: 3,000 ft. Total time: 3 weeks this date. Average 1,000' per week. Total production to date for job: 658,489 cu. yds. Total dredged length of canal by both dredges: approx. 6,000'. Overall length of canal project: 9,000'. Dredge now at station 27/100. Started at station 57/100. Kansas City District, Channel Diversion Project.
The dredges (Ste. Genevieve) and (William H. Black) as they dredge opposite each other with 100 feet reamining to mark completion of the canal to divert the river channel. An Earth wall 50 feet thick will not be dredged. It will be blasted out October 4, 1052. Dredges now at stations 6+00' and 7+00'. Kansas City District, channel diversion.
Showing left bank of Pilot Canal as dredge backs out after completing the first cut. On left bridge is (Miller) and wife. Kansas City District, diversion channel.
Looking into dredge cut face. Advance since start of excavation: 1,500'. Yardage: 325,000. Ste. Genevieve on right. Kansas City District, Pilot Canal Project.
Showing completed canal and the plug that separates the old and new channels, which will be blasted out October 4, 1952. Stern of dredge (William H. Black) is shown. Kansas City District, channel diversion.
Location of dredge in Pilot Canal on completion of dredging operations for cut No. 2. Just following departure, the second cut was made on left bank a distance of 1,800 ft. from upper end, which the view is towards.
Showing part of the completed river bank that will be one of the banks when the new river channel is completed. Kansas City District, Pilot Canal Project.
Photograph of the flyers for the Missouri River Passenger Packet on YELLOW-STONE (D.N. Greenleaf, master) and for the Regular Passenger Packet for Lexington, Liberty, Weston, & St. Joseph, Missouri River on the steam boat KATE SWINNEY (P.M. Chouteau, master).
Looking down river at completed rock revetment that will serve as the west bank for the new channel. This rocked bank extends approx. 9,000 feet. Kansas City District, channel diversion.
Material removed from Pilot Canal being discharged into Rover channel that is going to be diverted. Dredging for canal will be completed tonight. Dredge is at station 7+00'. The earth plug to be blasted is at station 6+50'. Kansas City District, channel diversion.
Dredge (William H. Black) as it prepares opening in bank to start dredging at upper end of Pilot Canal. The (Ste. Gen.) is at station 11+40, Kansas City District, channel diversion.
Dredging of first cut completed and dredge is about halfway of canal length as it backs out. View is to lower end of canal. Kansas City District, channel diversion.
Cutting through the upper access road used by levvee contractor. At station 13/50'-3:00 P.M. This is looking towards St. Joseph. Kansas City District, channel diversion.
View of crowd on bank of the Pilot Canal during ceremonies prior to blasting of plug that opened the diversion canal. Kansas City District, channel diversion.