The dredges (Ste. Genevieve) and (William H. Black) as they dredge opposite each other with 100 feet reamining to mark completion of the canal to divert the river channel. An Earth wall 50 feet thick will not be dredged. It will be blasted out October 4, 1052. Dredges now at stations 6+00' and 7+00'. Kansas City District, channel diversion.
Showing left bank of Pilot Canal as dredge backs out after completing the first cut. On left bridge is (Miller) and wife. Kansas City District, diversion channel.
Looking into dredge cut face. Advance since start of excavation: 1,500'. Yardage: 325,000. Ste. Genevieve on right. Kansas City District, Pilot Canal Project.
The dredges (Ste. Gen.) and (William Black) as the dredge opposite each other with 100 feet between them remaining, which will complete the diversion channel project. 50 ft. of the earth will not be dredged, it will be blasted. This is at station 7+00.
Dredge (William H. Black) as it prepares opening in bank to start dredging at upper end of Pilot Canal. The (Ste. Gen.) is at station 11+40, Kansas City District, channel diversion.
Dredging of first cut completed and dredge is about halfway of canal length as it backs out. View is to lower end of canal. Kansas City District, channel diversion.
The dredges (Ste. Genevieve) and (William H. Black) as they dredge opposite each other with 100' separating dredges to mark completion of the Diversion Channel Project. An Earth wall 50' thick will not be dredged. It will be blasted out. Dredges at station 6+00' and 7+00'. Kansas City District, channel diversion.
Approaching Kansas City while enroute from St. Joseph, Mo. To St. Louis. At right is dredge (William H. Black), which preceded us down river. Kansas City District.